Resin driveway cost is the first question on every enquiry, so here are the honest numbers before we ever visit: overlays on a sound base typically £60 to £80 per square metre; full dig-out and rebuild typically £120 to £160 per square metre. Below is what moves the price and what never should.
Get an Exact Fixed Price| Project | Typical size | Guide price | Typical time |
|---|---|---|---|
| Resin overlay on sound concrete/tarmac | 40m² | £2,400 to £3,200 | 1–2 days |
| Full dig-out, new base + resin (single drive) | 40m² | £4,800 to £6,400 | ~3 days |
| Full dig-out + resin (double drive) | 60–80m² | £7,200 to £12,800 | 3–5 days |
| Resin patio | 25m² | £1,900 to £3,500 | 2–3 days |
| Resin path | per m² | from ~£55/m² | with other works |
These bands align with national guidance published by Vuba (overlay £60 to £80/m², full build £120 to £160/m²) and reflect our own Lincolnshire jobs. Blends, borders, edging detail and access move a price within the band, never after you accept the quote.



The biggest factor by far. A sound existing slab saves thousands; a failed base must be rebuilt, and we will show you why on site rather than asking you to take it on trust.
Block borders, steel edging, channel drains, steps and two-tone designs each add modestly. They are also where a drive gets its looks, we price options separately so you choose.
Skip or grab access, distance from mixer to surface, and how much spoil leaves site. Quoted precisely at the visit, never padded.
Every quote follows a visit from the owner and a written specification, construction depths, materials, drainage. That is why we can fix it: a Grantham customer's July 2026 review records that their quote was “guaranteed would not increase”, and it did not. If we find something unforeseeable underground, we stop and talk, you decide before money is spent.
Every project we complete is covered by our 10-year workmanship guarantee, and the Vuba resin systems we install carry a product warranty of up to 20 years on top.
What voids it: alterations by others, vehicle loads beyond the agreed specification, or damage from ground movement outside the works area. We put all of this in writing before you pay a penny.
A fixed written price for your actual drive, free, from the owner.