A complete new driveway just in time for summer: dig-off and grab-away, levelled and compacted type 1, Geo Pave breathable membrane, Golden Flint 20mm gravel, Sorrento block entrance details and concreted entrances primed for resin.
Services: Gravel driveway · Block paving · Resin thresholds · Groundworks
The Ropsley project is the one we show people who ask what "proper groundworks" means. The team arrived to a tired frontage and began by digging the whole area off and having it grabbed away, no shortcuts over the old surface.
The area was then levelled and compacted before clean type 1 hardcore went down in courses. Over the compacted base we supplied and fitted Geo Pave breathable membrane, keeping the build fully permeable, then dressed the drive in Golden Flint 20mm gravel.
The entrances took the detail work: new Sorrento block pavers laid around the sides, then both entrances concreted so a resin surface could be bonded on top with Vuba resin primer, a belt-and-braces threshold that keeps gravel off the highway and gives the drive a crisp, finished arrival.
A lovely finish and a fast turnaround by the team, and a textbook example of why the base underneath decides how long a driveway lasts.








Free design visit from the owner, fixed written quote, 10-year guarantee.
Get a Free Quote